The Cloud Has a Postcode: Who Pays for AI’s Power, Water and Land?

Data centres are local: local grids, local water, local land. The profits are global. Who carries the cost, who captures the benefit, who decides?

FairByDesign Who Benefits title card: “The Cloud Has a Postcode” in cream text on a teal background with a clay bar

Follow the AI Money · Who Benefits

“The cloud” is a building. It sits in somebody’s town, draws on somebody’s grid and, often, somebody’s aquifer. This dialogue follows AI infrastructure down to ground level and asks who pays the local costs, who captures the benefit, and who gets a vote before the concrete is poured.

Picture a household in Northern Virginia opening its electricity bill in 2040. (They are illustrative; the numbers are not.) Nobody in that house voted for a data centre. Nobody sat through the rate case. But according to the state legislature’s own watchdog, a typical residential customer there could be paying an estimated $14 to $37 a month more in real terms for generation and transmission, largely because of buildings full of servers (Joint Legislative Audit and Review Commission, 2024).

Now cross an ocean. In 2024, data centres used 22 per cent of all the metered electricity in Ireland, up from 5 per cent in 2015 (Central Statistics Office, 2025). One building type now draws more than a fifth of a country’s metered power. If you live in Dublin and wonder why the grid feels tight, or if you live anywhere and wonder what the chatbot on your phone is physically made of, this is where the story starts.

Here is my proposition, and I want you to test it against the evidence below: the profits from AI’s buildings travel the world, but the bills stay local, and the people who pay them are rarely asked first.

Why 1.5 per cent is a trick of scale

The International Energy Agency, which is about as sober a source as energy has, estimates that data centres used around 415 terawatt-hours of electricity in 2024, about 1.5 per cent of global consumption, and that this is set to more than double to around 945 terawatt-hours by 2030, “slightly more than Japan’s total electricity consumption today” (International Energy Agency, 2025). The United States accounted for 45 per cent of data-centre consumption in 2024, China for 25 per cent and Europe for 15 per cent, and the IEA expects the US to account for by far the largest share of the increase. It also warns that around 20 per cent of planned data-centre projects could face delays because of grid constraints (International Energy Agency, 2025).

A global share of 1.5 per cent sounds manageable. That is the trap. Data centres cluster, because they need fibre, land, cheap power and permissive planning. So their costs are concentrated, not spread.

Ireland is one example. Northern Virginia is another. The 2024 study by Virginia’s Joint Legislative Audit and Review Commission found that an independent forecast had the state’s electricity demand doubling within ten years, with data centres as the main driver. That is where the $14 to $37 a month comes from (Joint Legislative Audit and Review Commission, 2024).

The same report is honest about the other column of the ledger. It found the sector supports substantial jobs and income, mostly through construction, and that the state’s sales-tax exemption for data-centre equipment was worth $928 million in the 2023 fiscal year (Joint Legislative Audit and Review Commission, 2024). Both things are true at once: there is a real benefit and a real bill. They just don’t land on the same people.

The receipt: who is paying for the power

The legal paper trail is where this gets pointed. Ari Peskoe and Eliza Martin of Harvard’s Electricity Law Initiative reviewed around fifty regulatory proceedings. They argued that utilities are using special contracts and rate structures in ways that shift the cost of serving very large data centres onto ordinary customers, writing that “utilities are forcing ratepayers to fund discounted rates for data centers” (Peskoe & Martin, 2025).

Utilities and data-centre operators contest that framing. And in fairness, regulators in some states have begun requiring very large new customers to carry more of their own costs. In Ohio, the Public Utilities Commission approved a settlement on 9 July 2025 that requires new, large data centres served by AEP Ohio to pay for at least 85 per cent of the electricity capacity they contract for, even if they use less, for up to 12 years. Industry groups have since appealed the decision to the Ohio Supreme Court (Office of the Ohio Consumers’ Counsel, n.d.).

Notice the shape of that fight. Nobody is arguing about whether the costs exist. The argument is about who carries them, and it is settled in rate cases that very few members of the public know are happening.

The neighbours who said no, from both parties

That is also why opposition has become local and, interestingly, bipartisan. Data Center Watch, which tracks community resistance in the US, counted $18 billion of projects blocked and $46 billion delayed between May 2024 and March 2025, with 142 activist groups across 24 states. They cited utility bills, water, noise, property values and lost green space (Data Center Watch, n.d.).

The group reported that opposing politicians were split roughly 55 per cent Republican and 45 per cent Democrat, with conservatives more likely to cite tax abatements and progressives more likely to cite environmental harm. The pace has since quickened. Its later quarterly reports count at least 75 projects worth about $130 billion blocked or delayed in the first quarter of 2026 alone, with opposition now active in 49 states, and at least 45 projects worth $68 billion in the second quarter (Data Center Watch, 2026a, 2026b).

People who agree on very little agree on this: they would like to be asked.

Who pays in water

Water is where the Global South enters the story most sharply. Computer scientists Pengfei Li, Jianyi Yang, Mohammad Islam and Shaolei Ren estimated that training GPT-3 in Microsoft’s US data centres could directly evaporate 700,000 litres of clean freshwater. They projected that global AI demand could account for 4.2 to 6.6 billion cubic metres of water withdrawal in 2027 (Li et al., 2025).

Those are model-based estimates, and they depend heavily on assumptions about cooling technology, climate and the power mix. They are still the best public attempt to put a number on something companies have mostly reported only in aggregate.

Quilicura: where the numbers have names

Chile faces a drought expected to last until 2040. In May 2024, Rest of World reported that 16 data centres had been approved in the Santiago metropolitan area since 2012 and 28 more had been announced. Google’s Quilicura facility extracts 50 litres a second from underground wells, and its second site was authorised to extract 228 litres a second (Urquieta & Dib, 2024).

Local groups including Mosacat filed environmental objections and demanded transparency. One activist, Tania Rodríguez, told the reporters: “It’s turned into extractivism. We end up being everybody’s backyard” (Urquieta & Dib, 2024).

And here is the twist: pushing back worked, at least once. After Chile’s Second Environmental Court partially upheld Cerrillos residents’ complaint about the water use of a planned Google data centre in February 2024, the company said that September that it would abandon the original design and restart the approval process for an air-cooled facility (Basoalto, 2024).

The fight is moving. The IEA expects Southeast Asia’s data-centre electricity demand to more than double by 2030, partly because of a regional hub in Singapore and southern Malaysia (International Energy Agency, 2025). The same arguments that arrived in Quilicura and Loudoun County are now arriving in Johor.

The best case against me

There is a technical argument that complicates the villain story, and I want to give it its due. Grid engineers will tell you that big, steady loads can help finance transmission that everyone uses. Some operators are investing in closed-loop cooling, heat reuse and new generation. Data-centre operators will tell you their efficiency per computation has improved dramatically.

Both can be true. And if a data centre really does pay its own way and helps fund a stronger grid, a town might rationally say yes. That is exactly the point. The question here is not whether data centres should exist. It is whether the communities that host them get the information and the leverage to set terms, rather than discovering the terms afterwards on their electricity bill.

The verdict: follow the money, then follow the bill

What follows is FairByDesign analysis. Read the infrastructure map the way you would read any power map.

Who benefits: mostly people far away. The companies that sell AI services globally, their shareholders, and users in wealthy markets. The local benefit is real but bounded: construction jobs, some permanent technical roles, and tax revenue that is often reduced by incentives.

Who pays: the neighbours. The local cost is physical and long-lived: grid upgrades paid through bills, groundwater drawn during droughts, land that will not be a park or a farm.

Who decides: the least visible forums we have. A zoning board, a utility rate case, a water permit, an investment agreement negotiated before the public hears about it.

So does the evidence support my proposition? On power, largely yes: the Virginia watchdog’s estimates and the Harvard review both point to costs that can fall on households, though Ohio shows regulators can push them back onto the companies. On water, the picture is real but less precise, because the best global numbers are models, not meter readings. On consent, the pattern is clear: from activist groups in dozens of US states to residents in a Chilean environmental court, people have had to organise, object and litigate to get a say.

What we still don’t know

We don’t yet know how the Ohio Supreme Court will rule, or whether other states will copy Ohio’s approach. We don’t have company-by-company, site-by-site water figures that anyone outside the companies can check. And we don’t know whether the efficiency gains operators point to will outrun the growth the IEA expects.

If you are young, this is your infrastructure too. The power plants, water rights and transmission lines being committed now will outlast the AI products they were built for. Decisions about them are being made with twenty- and thirty-year horizons, which means they are being made for you, whether or not you are in the room.

Which leaves the question this series keeps coming back to: if a town can be asked to host the machine, why can’t it be asked to set the price?

Disclosure: this article was researched, written and reviewed by FairByDesign. Claude, an AI model made by Anthropic, a company active in the debates discussed here, was used for editing. FairByDesign is solely responsible for its content. FairByDesign accepts no funding from any AI developer named here.

Join the dialogue

This is a story best told by the people who live next to it. We want to hear from residents and council members in towns that host or are considering data centres, from Quilicura to Querétaro, Johor to Loudoun County, Dublin to the Arizona desert; from utility regulators, ratepayer advocates and grid engineers; from hydrologists and farmers; from data-centre operators willing to explain their side with numbers; and from researchers measuring energy and water use independently. Tell us what we have missed, what has changed since these sources were published, and what a fair deal for a host community would look like.

Send evidence, corrections or a serious disagreement to info@fairbydesign.org with “Who Benefits” in the subject line; for sensitive material, see how we handle sources. With your permission, responses may be quoted in a follow-up or become a recorded conversation. You can also help without money: share this, send us your local planning documents, or introduce us to someone who has fought, or negotiated, a data-centre deal.

Support the dialogue. Somebody has to investigate who pays, who profits and who absorbs the costs when AI becomes physical infrastructure, and that somebody cannot be funded by the companies building it. Give once ($5, $10, $25, $50 or any amount), give monthly ($10 or $25), or become a patron at fairbydesign.org/patrons-2. Support never buys editorial control.

References

Basoalto, H. (2024, September 17). Google se rinde con proyecto original de Data Center en Cerrillos y anuncia futuro rediseño de la iniciativa. CNN Chile. https://www.cnnchile.com/negocios/google-se-rinde-con-proyecto-original-de-data-center-en-cerrillos-y-anuncia-futuro-rediseno-de-la-iniciativa_20240917/

Central Statistics Office. (2025, June 10). Data centres metered electricity consumption 2024. https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/datacentresmeteredelectricityconsumption2024/

Data Center Watch. (n.d.). $64 billion of data center projects have been blocked or delayed amid local opposition. Retrieved October 7, 2026, from https://www.datacenterwatch.org/report

Data Center Watch. (2026a). Q1 2026: Data Center Watch report. Retrieved October 8, 2026, from https://datacenterwatch.org/q1-2026

Data Center Watch. (2026b). Q2 2026: Data Center Watch report. Retrieved October 8, 2026, from https://www.datacenterwatch.org/q2-2026

International Energy Agency. (2025). Energy and AI. https://www.iea.org/reports/energy-and-ai

Joint Legislative Audit and Review Commission. (2024). Data centers in Virginia (Report 598). https://jlarc.virginia.gov/landing-2024-data-centers-in-virginia.asp

Li, P., Yang, J., Islam, M. A., & Ren, S. (2025). Making AI less “thirsty”: Uncovering and addressing the secret water footprint of AI models. Communications of the ACM. https://arxiv.org/abs/2304.03271

Office of the Ohio Consumers’ Counsel. (n.d.). Data center costs (Case No. 24-0508-EL-ATA). Retrieved October 8, 2026, from https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata

Peskoe, A., & Martin, E. (2025, March 5). Extracting profits from the public: How utility ratepayers are paying for Big Tech’s power. Harvard Electricity Law Initiative. https://eelp.law.harvard.edu/extracting-profits-from-the-public-how-utility-ratepayers-are-paying-for-big-techs-power/

Urquieta, C., & Dib, D. (2024, May 31). U.S. tech giants are building dozens of data centers in Chile. Locals are fighting back. Rest of World. https://restofworld.org/2024/data-centers-environmental-issues/

Leave a Reply